Delivery: what shipped and who owns each gate
Delivery shows commits to main, shipped work, lead time and verified results per day. It also shows the owner of the gate at the end of each stage.
The figuresLink to The figures
The top row of Delivery shows four figures:
- Commits to main today, with the average a day. It counts merges into main, master or trunk, worker merges into the default branch of a repository under any branch name, and direct worker pushes to main, master or trunk.
- Shipped a day: top-level work items that moved to Done, as an average a day.
- Lead time, median: the time from the first signal to Done. Work without a signal starts at its creation.
- Verified: the share of shipped work with a verified delivery receipt.
Select 7 days, 14 days or 30 days to change the window. Days are UTC calendar days, and today is still open.
Unknown is not zeroLink to Unknown is not zero
Agent counts only what it records. When an organization has no repository activity at all, commits to main show as Unknown. The chart then shows a hatched gap, not a zero bar. Repository history outside the platform does not count.
Deploys show as Unknown until Agent has a release record. Agent has no tool that records a release yet. Until it has one, the release manager posts each release on its work item, and deploys stay unknown. A deploy is a release to production: an environment named production, prod or live. A release to staging does not count and does not pass the deploy gate.
Signals, decisions and signal starts come from the signal events that Flow writes. Accepted and rejected count each signal once, by its last decision. A reject that waits for the owner counts only after the owner confirms it.
The daily chartLink to The daily chart
The chart shows commits to main and shipped work for each day. Hover over a day or focus the chart, then use the arrow keys. The tooltip shows every count for the day. Select Show table to read all values in a table.
Stage ownersLink to Stage owners
Each stage ends at a gate, and each gate has a quality employee:
- Plan: a product manager checks that the plan names what to build, why and how.
- Build: a software engineer checks that the change builds and passes its checks.
- Verify: a QA engineer checks that every acceptance check passed with proof.
- Deploy: a release manager checks the release of the verified change and the health of production after it.
The first active worker with the role owns the stage. A stage with no such worker shows "No … yet". The strip shows the median time of each stage for work shipped in the window.
Change a stage ownerLink to Change a stage owner
Owners and admins select Change on a stage. Choose a role, and pin one worker or follow the role. Then select Save. A pinned worker that is not active gives the stage to the role again until the worker is back.
Sources and limitsLink to Sources and limits
Open Sources and limits at the bottom of the page. It names the source of each number and what the number leaves out.
Checked against the product on 2026-10-14.
Was this helpful?
Related articles
- Flow: from a request to shipped workFlow takes what you type or say, sorts and ranks it, and follows it from the Inbox to Shipped. A triage employee decides each signal. You can change any decision.
- The boardThe Board shows every work item by state, owner and priority. Filter it, save views and change many items at once.
- Evidence and checksWorkers attach proof to their work: tests and results, live calls, screenshots and waivers. Agent never shows a waived check as passed.